 |
|
05/10/2007
Our web hosting plans now updated to Cpanel 11.
|
02/07/2006
Our shared web hosting plans disk space and bandwidth has been increased. |
02/01/2006
New Advanced Control Panel for our Shared Web Hosting.
|
|
| |
|
 |
|
|
|
|
|
|
| |
|
TOTALWEBHQ DATACENTER AND NETWORKS :
 |
| |
| Overview |
| |
| At Totalwebhq.com, we understand that to be the best, you need to have the best. That’s why we only use servers housed in world-class data centers located in Dallas, TX and Clifton, NJ. In order to serve our customers with the fastest and most reliable routing of traffic, our servers are placed inside a network of multiple connections to major Internet backbone carriers. |
|
|
Softlayer Datacenter, Dallas TX |
 |
|
| The SoftLayer datacenter is a Tier IV datacenter facility located inside the well known INFOMART telecom hotel near downtown Dallas. Specializing in datacenter and hosting facilities, INFOMART is home to multiple datacenters including MCI, Level 3, Equinix, Verio, Switch & Data, Verizon, DataSides, and more. The building sits atop three redundant electrical grids from TXU delivering diverse power to each quadrant of the building. HVAC needs are supplied via five one hundred ton onsite water chillers to deliver N+1 cooling requirements. Home to over twelve switch sites and thirty-five different carriers, INFOMART houses technology and telecom related businesses in a complex communications ecosystem. |
| |
| DedicatedNow Datacenter, Clifton NJ |
| |
|
| The DedicatedNOW Data Center resides in Clifton, NJ, just 14 miles from New York City. This new facility boasts enormous growth potential allowing us capabilities of up to 55,000 sq ft of pure datacenter floor space, and ease of access to backbone providers. Currently, the facility incorporates over 7,500 sq ft of completed raised floor data center space, along with 5000 sq ft of corporate office space which includes a front reception area, conference rooms, and ample space for our employees. The new datacenter has been carefully planned from inception to overcompensate for such factors as cooling, generators, UPS's, secondary generators, fire suppression, and much, much more. Our new facility has been set in place with 7,500 sq ft of raised flooring, 8 (eight) 20 ton AC units and double pre-action fire suppression system. Our datacenter is powered a Liebert UPS system and a Caterpillar generator with 4 days of standby fuel. Our datacenter is monitored 24/7/365 by an overlapping array of CCTV cameras and datacenter entry is secured by both biometric and card key access. |
| |
|
| |
|
|
|
|
|